Capital Planning and Development

Project Information 

Student Services Center

Latest Images:










View all

Project Description:

Construction was completed on the Student Services Center (SSC) in March 2007 and the Firstenburg Student Commons (FSC) in August 2007.  The project is a one stop arrival point and activity hub for students and campus visitors.  The buildings are centrally located for maximum accessibility and visabillity. 

The SSC is a designated campus arrival point and first stop for visitors.  The transparent south side of the SSC will provide easy orientation to the rest of the campus.  The upper level of the SSC provideds expanded space for the current student service operations as they are delivered to a growing student population, while accommodating the addition of new services and activities not previously available.  The ground level of the building houses the new Student Resource Center and the relocated Bookstore.  The site for the new facility is adjacent to the new Firstenburg Student Commons, overlooking an existing water feature. 

The FSC is a renovation and expansion of the existing Bookstore Building.  It provides student oriented space for Student Government, Career Counseling, Outdoor Recreation and a flexible large sized conference room/ student lounge. Site development includes a new arrival plaza between the SSC and the FSC. 



Project Team:

Current Project Phase:

  • Phase Name: Construction
  • Phase Start Date: 1/5/2006
  • Phase End Date: 7/1/2007

Contact Information:

Miscellaneous Dates:

  • Project Completion Date: 9/1/2007
  • Construction Start Date:

Project Costs:

  • Total Project Budget: $14,626,000
  • Estimated Construction Costs: -
  • Construction Costs: $9,395,251

The information for this project was last updated on 10/1/2008 by Dan Bodell

Capital Planning and Development, 225 SE Idaho Street, Pullman WA 99164-3611, 509-335-5571, cpd@wsu.edu